June 17 Model on the DeLeon White Gallery floor with full size floor drawing.

Toronto Waste truck unloading pop can bales

Each bale weighs around 400 pounds

June 17 Each bale contains around 11,000 cans

June 17 Building first wall

June 17 The last bale

June 17 First wall stacking is complete

June 17 Got to hammer in those loose ones

June 17 What do you think?

June 17 This one's done. One more to go!.

June 17 Collaborating artists Badanna Zack and Ian Lazarus.

June 18 Workig with The Toronto Waste team Alex Artuso, Joe Pugliatti, Terry George, and Oliver Stephenson

June 18

June 18

June 19

June 19 The Opening

June 19 The Opening

June 19 The Opening

June 19 The Opening

June 19 The Opening